96 3200 SCR
Now she rest
Employee appreciation day!
Inviting, isn't it?
Dash panels turned out pretty good!
Dish network on a boat???
Final coat of blk bottom paint
New Capacitor installed. Runs like a new one!
Same name, different lake
front half of Leta's new camper canvas
Rebuilt 7.4L with closed cooling added Port
Rebuilt 7.4L with closed cooling added strbd
New seacocks installed for 7.4L improved water flow
Quietly she sits
Sandblasted hull, epoxy filled and faired, 5 coats of Interlux 2 part epoxy, (alternating colors) 2 coats Interlux bottom paint. 3 coats on the sides.

All times are GMT. The time now is 06:23 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.