  1. The more awkward the location you need to work in, the more times you'll need to crawl in and out of the space to get tools and parts to complete the job.
  2. Regardless of how many trips to the store to buy parts and fasteners, you will almost never have the correct sized screw, bolt, nut or washer that you actually need.
  3. If you buy a part or fastener and have it available you will not need it.
  4. You will invariably realize you are either missing a part or fastener 5 minutes after the store closes.
  5. When you arrive at the store to purchase a part or fastener (if they are open) they will have every size except the size you actually need.
  6. The store will have a large variety of nuts and bolts, however rarely will they have both the nut AND the bolt in the same size.
__________________

shrew is offline   Reply With Quote
Old 04-30-2015, 01:56 PM   #2
Captain
 
Kevlar7r's Avatar
 
Join Date: Aug 2014
Location: Jacksonville, FL
Posts: 746
Default

7. With amazing frequency, your total for the project will be right around $1,000.
__________________

Kevlar7r is offline   Reply With Quote
Old 04-30-2015, 03:57 PM   #3
Admiral
 
mmwjr's Avatar
 
Join Date: Feb 2012
Location: Essex, Maryland
Posts: 10,176
Default

8. Don't mess with Mrs. Murphy
__________________
1997 Silverton 362, 7.4 Crusaders
1997 2400 SCR, 5.7 Vortec / Bravo 2

Mike
mmwjr is offline   Reply With Quote
Old 04-30-2015, 04:34 PM   #4
Lieutenant
 
Sled600's Avatar
 
Join Date: Jul 2013
Location: Everett wa
Posts: 90
Default

Murphy was an optimist.
Sled600 is offline   Reply With Quote
Old 04-30-2015, 06:23 PM   #5
Admiral
 
biggerseagar's Avatar
 
Join Date: Dec 2010
Location: central Illinois
Posts: 2,279
Default

I would like to add the 4 bolt theory. The first three bolts will come out easy except for the fourth one, which you will spent as much time on that fourth one as you did on all three.

Always do the hard one first....
biggerseagar is offline   Reply With Quote
Old 04-30-2015, 06:26 PM   #6
Captain
 
Kevlar7r's Avatar
 
Join Date: Aug 2014
Location: Jacksonville, FL
Posts: 746
Default

Boat electronics: After metering out every inch of wire on the boat, the problem was always the first thing you checked, but didn't notice the problem (i.e., breakers, switches, fuses)
Kevlar7r is offline   Reply With Quote
Old 05-01-2015, 02:05 AM   #7
Lt. JG
 
Join Date: Apr 2015
Location: Seattle, WA
Posts: 36
Default

9) You will get thru with an upgrade and say, "I wish I would have done it a different way".
__________________
Phil, Vicky, Ashleigh & Sydney
1998 3055

Life is short, boats are cool.
itsabowtime2 is offline   Reply With Quote
Old 05-01-2015, 02:45 PM   #8
Moderator

 
shrew's Avatar
 
Join Date: Apr 2008
Posts: 5,588
Default

It's along the line of my 'theory of threes'. You will estimate a job will take you 3 times longer than a professional. The actual time to completion will be 3 times the estimated time.

Professional: 3 hrs.
Estimate DIY: 9 hrs.
Actual DIY: 27 hrs.
shrew is offline   Reply With Quote
Old 05-01-2015, 05:51 PM   #9
Admiral
 
Phillbo's Avatar
 
Join Date: Mar 2012
Location: Lake Powell
Posts: 1,613
Default

10) no matter the size of your boat you will always want one 2' bigger.
Phillbo is offline   Reply With Quote
Old 05-02-2015, 03:06 AM   #10
Lt. JG
 
Join Date: Apr 2015
Location: Seattle, WA
Posts: 36
Default

Quote:
Originally Posted by shrew View Post
It's along the line of my 'theory of threes'. You will estimate a job will take you 3 times longer than a professional. The actual time to completion will be 3 times the estimated time.

Professional: 3 hrs.
Estimate DIY: 9 hrs.
Actual DIY: 27 hrs.
How true, how true!!
__________________
Phil, Vicky, Ashleigh & Sydney
1998 3055

Life is short, boats are cool.
itsabowtime2 is offline   Reply With Quote
Old 08-31-2016, 01:24 AM   #11
Ensign
 
Join Date: Aug 2016
Posts: 1
Default

Quote:
Originally Posted by biggerseagar View Post
I would like to add the 4 bolt theory. The first three bolts will come out easy except for the fourth one, which you will spent as much time on that fourth one as you did on all three.

Always do the hard one first....
If you do the hard one first, you will realize there was no real need to remove them.
__________________

bando is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Powered by vBadvanced CMPS v3.2.3

All times are GMT. The time now is 10:38 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.